Bunn Dual TF BrewWISE DBC Guía para resolver problemas Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 31
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Bunn-O-Matic Corporation
19
Preventive Maintenance
In order to maintain proper operation and long service life BUNN recommends performing the preventive mainte-
nance every 6 months. Individual customers will vary with some customers choosing not to receive preventive main-
tenance.
Tools Required:
• 2 Flat blade screwdrivers (#1 - #2)
• Phillips screwdriver
• 2 adjustable wrenches
• Channel lock pliers
• Needle nose pliers
• Deliming tool BUNN PN: 38227.0000
Prior to servicing the brewer:
• Disconnect the electrical supply
• Shut off the water supply
• Drain the water tank
• Remove the front panel
• Remove the top panel
PM Steps
IfcustomerhasaBUNNwaterltrationsysteminstalledbeforethebrewer,replacethelterorltercartridgeand
purge before installing to the brewer.
Step 1: Rebuild the inlet solenoid
Shut off the water supply.
□ Removebothwiresfromtherellvalve.
Disconnect both water lines at the valve.
Remove the two 1/4”-20 screws securing the valve
to the component mounting bracket.
Step3:Removeandcleanthelltube
□ Usinganadjustablewrenchremovethetubettingfromthelltubeontopofthetank
□ Gentlypullthelltubeoutofthetopofthetank
Wipe any mineral deposits from the exterior of the tube
Clean any mineral deposits from the bottom of the tube
Clean any obstructions from the interior of the tube
Reinstallation is the opposite of removal
Step 4: Rebuild the by-pass solenoids
Remove the hose clamps that secure the tubing to the valve
Remove the two nuts that hold the solenoid bracket to the machine
Gently remove the tubing from the valve body
□ Usingaatbladescrewdriver,removethefourscrewsandseparatethevalveassembly
Replace plunger, spring, and rubber seat using the rebuild kit.
Clean any mineral build-up from the valve
Reassembly is the opposite of disassembly
Step 5: Rebuild the dispense solenoids
Disconnect the wire leads to the solenoid
Unscrew the sprayhead from the bottom of the valve
Remove the securing nut from the bottom of the valve
□ Removetheclipfromthetubeonthevalvetting
□ Removethetubefromthebarbedttingontherearofthevalve
Remove the valve from the brewer
Remove the four Phillips head screws and disassemble the valve
Replace plunger, spring, and rubber seat using the rebuild kit. BUNN P/N: 11517.0008
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 30 31

Comentarios a estos manuales

Sin comentarios