
TF BrewWISE
®
Training Manual
6
Units without a Neutral
Theeld-switchableDualswillhaveaninternalstep-downtransformeranda2-polecontactorinadditiontoa3rd
heating element. The step-down transformer is a 208/240-120VAC transformer. The transformer is installed for loca-
tions that do not have a neutral on site.
Initial Start-Up
Step 1: Flip the master On/Off switch to the On position.
Whenthemachineisturnedon,itwillbegintollthetank.Afterthetankllsthemachine
will automatically begin the heating cycle. This will take approximately 20 minutes.
Once the water temperature has reached the programmed Brew Lockout temperature it will
display the ready screen. The machine will continue to heat until it reaches its programmed
shut-off temperature.
PLEASE WAIT
TANK FILLING
HEATING
READY TO BREW
WATER TEMP ###°
WATER TEMP 200°
200 and 230 volt ac
single phase, 60 Hz models
Note: This electrical service
consists of 2 current carrying
conductors (L1 and L2) and a
separate conductor for earth
ground.
L2 RED
200 or
230V
GREEN
L1 BLACK
GREEN
120/208 and 120/240 volt ac
multi phase, 60 Hz models
Do NOT connect an external neu-
tral to this brewer.
Note: This electrical service con-
sists of 3 current carrying conduc-
tors (L1, L2 and L3) and a separate
conductor for earth ground.
GREEN GREEN
L1 BLACK L1 BLACK
L3 BLU L3 BLU
L2 RED L2 RED
Do NOT connect an external neutral to this brewer.
Note: This electrical service consists of 3 current carrying conductors (L1, L2 and L3) and a separate conductor for
earth ground. For single phase installation, L3 (blue) terminal is not used.
Comentarios a estos manuales